Search Results

1st Huabei OCTG Machinery Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • East Ring Road 102#, Qingxian County, Hebei Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, NDT, Upsetting

EXPIRED

  • Valid from:

  • August 22, 2015

  • Valid to:

  • August 21, 2017

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility therefore were not assessed.

Baoshan Iron & Steel Co., Ltd.; Tube, Pipe and Bar Business Unit

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 885 Fujin Road, Baoshan District, Shanghai, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Valid from:

  • July 21, 2018

  • Valid to:

  • July 20, 2020

  • Registered since:

  • July 21, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Besmindo Australia Pty Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Unit 9, 20 Malcolm Road, Maddington, Perth WA 6109, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • December 10, 2014

  • Valid to:

  • December 09, 2015

  • Registered since:

  • December 10, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 12 Livingstone St, Broome, WA 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • February 26, 2015

  • Valid to:

  • February 25, 2016

  • Registered since:

  • February 26, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Bohai NKK Drill Pipe Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Threading

  • Valid from:

  • November 24, 2017

  • Valid to:

  • November 23, 2019

  • Registered since:

  • November 24, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Bossong Engineering Pty. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 189 Planet Street, Welshpool, Western Australia, 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • August 10, 2018

  • Valid to:

  • August 09, 2020

  • Registered since:

  • August 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 26 McDaniel Road, Minyirr , Western Australia, 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • August 10, 2018

  • Valid to:

  • August 19, 2020

  • Registered since:

  • August 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

China Oilfield Services Ltd. (COSL Drilling)

FACILITY APPROVAL

Inspection

  • Facility:

  • P.O. BOX 521 Tanggu , Tianjin 300452, People's Republic of China

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)
    - Dye Penetrant Inspection (DPI), Electromagnetic Inspection (EMI), Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Visual and Dimensional Inspection

  • Inspectors:  

  • Li Tianying

  • Ding Shilei

  • Yang Wenliang

  • Geng Tao

  • Valid from:

  • March 28, 2019

  • Valid to:

  • March 27, 2020

  • Registered since:

  • March 28, 2019

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

Command Drilling Products USA Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18911 West Industrial Parkway, New Caney, Texas 77357, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • February 15, 2016

  • Valid to:

  • February 14, 2017

  • Registered since:

  • February 15, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18911 West Industrial Parkway, New Caney, Texas 77357, United States

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Assembly, Inspection, Testing

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • February 15, 2016

  • Valid to:

  • February 14, 2017

  • Registered since:

  • February 15, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

DP-Master Manufacturing Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Upsetting

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Valid from:

  • December 13, 2017

  • Valid to:

  • December 12, 2019

  • Registered since:

  • March 11, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Valid from:

  • April 10, 2018

  • Valid to:

  • April 09, 2020

  • Registered since:

  • January 21, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Machining

  • Valid from:

  • January 31, 2019

  • Valid to:

  • January 30, 2020

  • Registered since:

  • January 31, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Body - Sour Service (NS.03.30.10.1110)
    - Heat Treatment, Inspection, Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Upsetting

  • Drill Pipe - Sour Service (Critical Sour Drilling IRP Vol. 1 Section 1.8)
    - Assembly, Inspection, Testing

  • Valid from:

  • December 13, 2017

  • Valid to:

  • December 12, 2019

  • Registered since:

  • September 17, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Dongying Weima Petroleum Drilling Tools Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Testing

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly

  • Valid from:

  • February 28, 2019

  • Valid to:

  • February 27, 2021

  • Registered since:

  • February 15, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Hardbanding

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Inspection, Machining

  • Valid from:

  • February 28, 2019

  • Valid to:

  • February 27, 2021

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Golden Ring Industrial Limited-Liability Company Liaohe Oilfield Panjin

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Huanxi Street, Xinglongtai District,, Panjin, Liaoning, People's Republic of China

  • Equipment:

  • Pre-stressed Insulated Tubing (PJQR/QR-5.4-01.A/0 version 2018.3)
    - Inspection, NDT, Threading, Upsetting

  • Valid from:

  • April 14, 2019

  • Valid to:

  • April 13, 2020

  • Registered since:

  • April 14, 2019

  • Standards:

  • SY/T5324-2013

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

  • China Standard SY/T5324-2013: Section 6.1.1 & 6.1.2 Mechanical Property Testing and Section 7.1.2 Acceptance Inspection.

Grant Prideco (Jiangsu) Drilling Products Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • January 08, 2019

  • Valid to:

  • January 07, 2021

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Valid from:

  • January 08, 2019

  • Valid to:

  • January 07, 2021

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Guizhou Gaofeng Petroleum Machinery Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.22 Changling South Road, Guanshanhu District, Guiyang City, Guizhou Province, 550081, People's Republic of China

  • Equipment:

  • Fishing Jars & Accelerators (NS.07.30.00.1110)
    - Inspection, Machining, Surface Treatment, Testing, Threading

  • Drilling Jars & Accelerators (Hydraulic) (NS.06.42.11.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drilling Jars & Accelerators - (Mechanical) (NS.06.42.17.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Roller Reamer - Angle, Low Alloy, Non-Sour (NS.03.44.60.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Roller Reamer - Straight, Low Alloy, Non-Sour (NS.03.44.60.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Fishing Tools (NS.03.39.00.1110)
    - Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • March 12, 2019

  • Valid to:

  • March 11, 2021

  • Registered since:

  • March 12, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gaofeng Town, Gui'An New District, Guizhou Province, 550081, People's Republic of China

  • Equipment:

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Kelly Valve Sub (NS.03.35.01.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • March 12, 2019

  • Valid to:

  • March 11, 2021

  • Registered since:

  • March 12, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hebei Huayouyiji Tuboscope Coating Co., Ltd. (HHTCC) – Jiangyin Facility

FACILITY APPROVAL

Service

  • Facility:

  • Hetun Road West, Shengang Town, Jiangyin City, Jiangsu Province 214443, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TK 34, TK 34XT, DPC, TK 2, TK 7, TK 21 Tubular, TK 33, TK 69, TK 15, TK 70, TK 70XT, TK 34P, TK 216, TK 236, TK 505, TK 800, TK 805

  • Valid from:

  • January 08, 2019

  • Valid to:

  • January 07, 2021

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Products and Services.

Hebei Huayouyiji Tuboscope Coating Co., Ltd. (HHTCC) – Qing Xian Facility

FACILITY APPROVAL

Service

  • Facility:

  • No.102 Dong Huan Road Qing County Hebei Province, 062658, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TK 34, TK 34XT, DPC, TK 2, TK 7, TK 21 Tubular, TK 33, TK 69, TK 15, TK 70, TK 70XT, TK 34P, TK 216, TK 236, TK 505, TK 800, TK 805

  • Valid from:

  • January 08, 2019

  • Valid to:

  • January 07, 2021

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Products and Services.

Hebei Longway Petroleum Equipment Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Beikou Village, Yingli Town , Jinzhou, Shijiazhuang City, Hebei, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Testing

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly

  • Valid from:

  • September 01, 2018

  • Valid to:

  • August 31, 2020

  • Registered since:

  • September 01, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Henan Shenlong Petroleum Drilling Tools Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Yugong South Road, Tech Zone, Jiyuan City, Henan Province, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • July 25, 2017

  • Valid to:

  • July 24, 2019

  • Registered since:

  • July 25, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Yugong South Road, Tech Zone, Jiyuan City, Henan Province, People's Republic of China

  • Equipment:

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading, Welding of Blades to the Body

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading, Welding of Blades to the Body

  • Pup Joints - Non Magnetic, High Alloy, Non-Sour (03.65.00.3110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading, Welding of Blades to the Body

Re-approval Assessment in Progress

  • Valid from:

  • July 25, 2017

  • Valid to:

  • July 24, 2019

  • Registered since:

  • July 25, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Henan Zhongyuan Special Steel Equipment Manufacturing Co., Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Jiyuan City Henan Province, 459008, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling of Threads & Stress Relief Features, Forging, Inspection, Machining, Testing, Threading

  • Valid from:

  • June 20, 2018

  • Valid to:

  • June 19, 2020

  • Registered since:

  • June 20, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hilong Petroleum Pipe Company LLC

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding, Internal Plastic Coating

EXPIRED

  • Valid from:

  • January 12, 2015

  • Valid to:

  • January 12, 2017

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hunting Energy Services Limited

FACILITY APPROVAL

Rental

  • Facility:

  • Unit 1, Hareness Circle, Altens Industrial Estate, AB12 3LY, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)

  • Stabilisers - Integral Blade (NS.03.38.82.1110)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Stabilisers - Welded Blade (NS.03.38.78.1110)

  • Hole Openers (NS.03.44.58.1110)

  • Stabilisers - Non Magnetic (NS.03.65.00.3110)

SUSPENDED

  • Valid from:

  • November 01, 2015

  • Valid to:

  • October 31, 2017

  • Registered since:

  • November 01, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

ICO Asiapacific Brunei Sdn Bhd

FACILITY APPROVAL

Inspection

  • Facility:

  • No. 143, Simpang, 141-145, Jalan Sungai Pandan, Kuala Belait KA 1931, Negara, Brunei Darussalam

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)
    - Electromagnetic Inspection (EMI), Magnetic Particle Inspection (MPI), Ultrasonic Testing of End Area (UTEA), Visual and Dimensional Inspection

  • Inspectors:  

  • Fredrick Periman

  • Yusriono Saragih

  • Valid from:

  • March 15, 2019

  • Valid to:

  • March 14, 2020

  • Registered since:

  • March 15, 2019

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

Jiangsu Hexin Petroleum Machinery CO., LTD

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.9, Weiwu Road, Dongtai Industrial Park, Dongtai City, Jiangsu Province, 224200 , People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Testing

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • January 31, 2018

  • Valid to:

  • January 30, 2019

  • Registered since:

  • January 31, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Heat Treatment, Inspection, Testing, Upsetting

  • Valid from:

  • March 31, 2019

  • Valid to:

  • March 30, 2021

  • Registered since:

  • February 10, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Machining, Testing

  • Valid from:

  • March 31, 2019

  • Valid to:

  • March 30, 2021

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu Shuguang Oil Tools Limited

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, , Baimi Town, Jiangyan District, Taizhou City, Jiangsu Province, 225532 , People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, NDT, Threading

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, NDT, Threading

  • Valid from:

  • June 11, 2019

  • Valid to:

  • June 10, 2021

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility therefore were not assessed.

Jiangsu TSC Coating Co., Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • Shuguang Industrial Park, Shuguang Road, Baimi Town, Jiangyan City, Jiangsu Province, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000

EXPIRED

  • Valid from:

  • February 10, 2015

  • Valid to:

  • February 09, 2017

  • Registered since:

  • November 14, 2006

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangyin Beilong Petroleum Pipe Co., Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 95 Xili Road, Ligang Town, Jiangyin City, Jiangsu , People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Manufacture of Tools Joints Only: Heat Treatment, Machining, Threading, Cold Rolling of Threads, NDT & Inspection

SUSPENDED

  • Valid from:

  • October 10, 2018

  • Valid to:

  • October 09, 2019

  • Registered since:

  • October 10, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangyin DJ Coating Co., Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • No.797, West Binjiang Road, New Harbor City , Economy Development Zone , People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • Powder Coating Product TJ 206

  • Valid from:

  • November 28, 2018

  • Valid to:

  • November 27, 2019

  • Registered since:

  • November 28, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015. Sect 8.3 Design and Development of Products and Services

Jiangyin Hengyang Petroleum Machinery Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.888, Yangzi River Road, Huangtu Town, Jiangyin City, Jiangsu, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling, Forging, Heat Treatment, Inspection, Machining, Threading

EXPIRED

  • Valid from:

  • September 30, 2015

  • Valid to:

  • September 29, 2017

  • Registered since:

  • September 30, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility and therefore were not assessed.

Jiangyin Long-Bright Drill Pipe Manufacture Co. Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.820, Binjiang West Road, Ligang Town, Jiangyin City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding

EXPIRED

  • Valid from:

  • January 26, 2015

  • Valid to:

  • January 25, 2017

  • Registered since:

  • January 26, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangyin Yashen Petroleum Pipe Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 95, Xili Road,, Ligang Town, Jiangyin, Jiangsu, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Forging, Heat Treatment, Inspection, Testing, Threading

EXPIRED

  • Valid from:

  • February 08, 2015

  • Valid to:

  • February 07, 2016

  • Registered since:

  • February 08, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility and therefore were not assessed.

Knight Oil Tools Tri*Drill Services

FACILITY APPROVAL

Service

  • Facility:

  • 1001, Briar Patch Road,, Broussard,, Louisiana 70518, United States

  • Service:

  • Hardbanding Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • Tritanium, Duraband® NC, Tuffband NC, Stoody HB 56

EXPIRED

  • Valid from:

  • May 01, 2014

  • Valid to:

  • April 30, 2016

  • Registered since:

  • May 01, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Nantong Yongda Pipe Industry Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 111, Kaiyuan Road, Hai’an Industry Park, Hai’an Country, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Machining, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • April 24, 2018

  • Valid to:

  • April 23, 2020

  • Registered since:

  • April 24, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

OOO “Technomash”

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 47 Demyana Bednogo St., Nevyansk, Sverdlovsk oblast, 624191, Russian Federation

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly

  • Valid from:

  • July 08, 2019

  • Valid to:

  • July 07, 2020

  • Registered since:

  • July 08, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

OTTO FUCHS KG

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Derschlager Strabe 26, 58540 Meinerzhagen , Germany

  • Equipment:

  • Drill Pipe - Aluminium with Shrink Fit Tool Joints, HIgh Alloy (NS.03.30.80.7110)
    - Assembly, Extrusion, Heat Treatment, Inspection, Solution Heat Treatment, Testing

  • Valid from:

  • September 11, 2018

  • Valid to:

  • September 10, 2020

  • Registered since:

  • September 11, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.7.1.2 Servicing

PLCO Manufacture Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1201, Zhencheng Road, Shen-gang Town, Jiangyin City,, Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Forging, Heat Treatment, Inspection, Testing, Threading

EXPIRED

  • Valid from:

  • September 30, 2014

  • Valid to:

  • September 29, 2016

  • Registered since:

  • September 30, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Paradigm Drilling Services

FACILITY APPROVAL

Rental

  • Facility:

  • Caimiestone Road, , Thainstone, Inverurie,, Scotland, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Stabilisers - Integral Blade (NS.03.38.82.1110)

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)

  • Stabilisers - Welded Blade (NS.03.38.78.1110)

EXPIRED

  • Valid from:

  • December 17, 2015

  • Valid to:

  • December 16, 2016

  • Registered since:

  • December 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Caimiestone Road, , Thainstone, Inverurie,, Scotland, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Welded Blade (NS.03.38.78.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • December 17, 2015

  • Valid to:

  • December 16, 2016

  • Registered since:

  • December 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Petromaterials (Cangzhou) Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • May 14, 2018

  • Valid to:

  • May 13, 2020

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Surface Treatment, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing

  • Valid from:

  • May 14, 2018

  • Valid to:

  • May 13, 2020

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Pipe & Drilling Tools Manufacture Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Petro & High-Tech Industrial Park Economic Development Zone, Panjin City, Liaoning 124013, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • August 22, 2017

  • Valid to:

  • August 21, 2019

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Rotary Drilling Tools USA LLC

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 9022 Vincik Ehlert, Beasley , TX 77414, United States

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Processes being assessed

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Processes being assessed

EXPIRED

  • Valid from:

  • April 28, 2015

  • Valid to:

  • April 27, 2016

  • Registered since:

  • April 28, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 9022 Vincik Ehlert, Beasley , TX 77414, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • April 28, 2015

  • Valid to:

  • April 27, 2016

  • Registered since:

  • April 28, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Schlumberger Drilling Tools & Remedial

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 1310 Rankin Road, Houston, Texas 77073, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • November 25, 2017

  • Valid to:

  • November 24, 2019

  • Registered since:

  • November 25, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 1310 Rankin Road, Houston, Texas 77073, United States

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Inspection, Machining

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • November 25, 2017

  • Valid to:

  • November 24, 2019

  • Registered since:

  • November 25, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing

Shanghai Hilong Drill Pipe Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • January 15, 2018

  • Valid to:

  • January 14, 2020

  • Registered since:

  • January 15, 2009

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • January 15, 2018

  • Valid to:

  • January 14, 2020

  • Registered since:

  • June 01, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Shanghai Tianhe Oil Engineering Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Heat Treatment, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanghai Tube-Cote Petroleum Pipe Coating Co., Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • 669 Jinle Road, Yuepu Industry Park, Baoshan District,Shanghai, 200941, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000P

  • Valid from:

  • September 15, 2019

  • Valid to:

  • September 14, 2020

  • Registered since:

  • September 15, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Products and Services.

FACILITY APPROVAL

Service

  • Facility:

  • 669 Jinle Road, Yuepu Industry Park, Baoshan District,Shanghai, 200941, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000

EXPIRED

  • Valid from:

  • March 30, 2017

  • Valid to:

  • March 29, 2019

  • Registered since:

  • November 14, 2006

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanxi Fenglei Drilling Tools Co., Ltd. (Shanxi North Fenglei Industrial Group Co., Ltd.)

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2017

  • Valid to:

  • March 28, 2019

  • Registered since:

  • March 29, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2017

  • Valid to:

  • March 28, 2019

  • Registered since:

  • April 10, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2017

  • Valid to:

  • March 28, 2019

  • Registered since:

  • April 10, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Inspection, Machining, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2017

  • Valid to:

  • March 28, 2019

  • Registered since:

  • March 29, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Sub-drill Supply Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Endeavour Drive, Arnhall Business Park, Westhill, Aberdeenshire , AB32 6UF, Scotland, United Kingdom

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Top Drive Saver Subs (NS.03.60.00.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • May 02, 2017

  • Valid to:

  • May 01, 2019

  • Registered since:

  • May 02, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Subsidiary Enterprise - Drill Collars and Kellys Plant

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 2, Komarova Street Sumy, 40020, Ukraine

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • October 20, 2017

  • Valid to:

  • October 19, 2019

  • Registered since:

  • October 20, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 2, Komarova Street Sumy, 40020, Ukraine

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • October 20, 2017

  • Valid to:

  • October 19, 2019

  • Registered since:

  • October 20, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Surbo Tubular Services, Inc

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 8861 Park Ave, Houma, Louisiana 70363, United States

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Top Drive Saver Subs (NS.03.60.00.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Testing, Threading

  • Valid from:

  • February 14, 2018

  • Valid to:

  • February 13, 2020

  • Registered since:

  • February 14, 2017

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

TSP Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 34-74 Sanggae-ro, Nam-gu, Ulsan, South Korea

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 08, 2016

  • Valid to:

  • October 07, 2018

  • Registered since:

  • October 08, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Tianhe Oil Group Huifeng Petroleum Equipment Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 101, Committee 1,, Xinhua Bei, Hailing City,, Mudanjiang, Heilongjiang, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

SUSPENDED

  • Valid from:

  • June 13, 2012

  • Valid to:

  • June 12, 2013

  • Registered since:

  • November 05, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Vallourec Drilling Products France

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Aulnoye-Aymeries Facility, 62 rue de Leval, 59620 Aulnoye, France

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • June 04, 2016

  • Valid to:

  • June 03, 2018

  • Registered since:

  • June 04, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • ZA Du Tremblat, Route De Villechaud , 58200 Cosne Sur Loire, France

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 7 Rue des Frères Lumière,, 58200 Cosne sur Loire, France

  • Equipment:

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Kelly Valve Sub (NS.03.35.01.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

WellConnection Mongstad AS

FACILITY APPROVAL

Service

  • Facility:

  • Storemyra 279, 5954, Mongstad, Norway

  • Service:

  • Cold Rolling

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Top Drive Saver Subs (NS.03.60.00.1120)

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)

  • Valid from:

  • September 16, 2019

  • Valid to:

  • September 15, 2020

  • Registered since:

  • September 16, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Product and Services.

Black Diamond

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Rotary (NS.03.30.00.1110)

  • Valid from:

  • October 01, 2018

  • Valid to:

  • September 30, 2019

  • Registered since:

  • October 01, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

  • Valid from:

  • October 01, 2018

  • Valid to:

  • September 30, 2019

  • Registered since:

  • October 01, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DP-Master Manufacturing (S) Pte Ltd.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

  • Valid from:

  • June 26, 2019

  • Valid to:

  • June 25, 2021

  • Registered since:

  • June 26, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Rotary (NS.03.30.00.1110)

  • Valid from:

  • June 25, 2019

  • Valid to:

  • June 24, 2020

  • Registered since:

  • June 25, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

  • Valid from:

  • July 26, 2019

  • Valid to:

  • July 25, 2021

  • Registered since:

  • June 26, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

  • Valid from:

  • February 05, 2018

  • Valid to:

  • February 04, 2020

  • Registered since:

  • February 05, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

  • Valid from:

  • April 28, 2019

  • Valid to:

  • April 27, 2021

  • Registered since:

  • April 28, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

  • Valid from:

  • April 28, 2019

  • Valid to:

  • April 27, 2021

  • Registered since:

  • April 28, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

  • Valid from:

  • July 08, 2019

  • Valid to:

  • July 07, 2020

  • Registered since:

  • July 08, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DP-Master Manufacturing Co. Ltd.

DESIGN APPROVAL

Equipment

  • Name:

  • Drill Pipe - Sour Service (Critical Sour Drilling IRP Vol. 1 Section 1.8)

  • Valid from:

  • December 13, 2017

  • Valid to:

  • December 12, 2019

  • Registered since:

  • September 17, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DSI FZE

DESIGN APPROVAL

Equipment

  • Name:

  • PBL - Bypass System (NS.03.38.82.1110 (Rev 04), NS.06.42.11.1110 (Rev 04)

  • Valid from:

  • August 21, 2018

  • Valid to:

  • August 20, 2020

  • Registered since:

  • August 21, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Don Mashburn Inc.

DESIGN APPROVAL

Equipment

  • Name:

  • Kelly Valve Sub (NS.03.35.01.1110)

Re-approval Assessment in Progress

  • Valid from:

  • May 01, 2017

  • Valid to:

  • April 30, 2019

  • Registered since:

  • May 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • Down Hole Filter Subs (NS.03.60.00.1110)

Re-approval Assessment in Progress

  • Valid from:

  • May 01, 2017

  • Valid to:

  • April 30, 2019

  • Registered since:

  • November 28, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Frank's International LLC

DESIGN APPROVAL

Equipment

  • Name:

  • Harmonic Isolation Tool (NS.03.38.82.1110,NS.03.60.00.1110)

EXPIRED

  • Valid from:

  • June 12, 2017

  • Valid to:

  • June 11, 2018

  • Registered since:

  • June 12, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • Q-Sub™ (NS.03.60.00.1120 (Rev 00) for the Main body (Part 2013521032) NS.10.31.01.1110 (Rev 02) for the packer cups NS.10.35.24.1110 (Rev 02) for the Flow tube (Part 2013521033), Telescopic Tube (Part 2013521)

EXPIRED

  • Valid from:

  • April 23, 2018

  • Valid to:

  • April 22, 2019

  • Registered since:

  • April 23, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Golden Ring Industrial Limited-Liability Company Liaohe Oilfield Panjin

DESIGN APPROVAL

Equipment

  • Name:

  • Pre-stressed Insulated Tubing (PJQR/QR-5.4-01.A/0 version 2018.3)

  • Valid from:

  • April 14, 2019

  • Valid to:

  • April 13, 2020

  • Registered since:

  • April 14, 2019

NS-1™ Level 2 Certificate No: 218/19-2

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

NOV Downhole Eurasia Ltd.

DESIGN APPROVAL

Equipment

  • Name:

  • Motor Catch Top Sub (NS.03.60.00.1110)

SUSPENDED

  • Valid from:

  • December 15, 2015

  • Valid to:

  • December 14, 2017

  • Registered since:

  • December 15, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

RDT Inc.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110)

EXPIRED

  • Valid from:

  • August 28, 2018

  • Valid to:

  • August 27, 2019

  • Registered since:

  • August 28, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Shanghai Hilong Drill Pipe Co., Ltd.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110, NS.03.30.80.1110, NS.03.30.80.1120)

EXPIRED

  • Valid from:

  • May 18, 2018

  • Valid to:

  • May 17, 2019

  • Registered since:

  • May 18, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Connection - Double Shoulder Rotary Drilling (NS.03.30.00.1110, NS.03.30.80.1110, NS.03.30.80.1120)

EXPIRED

  • Valid from:

  • May 18, 2018

  • Valid to:

  • May 17, 2019

  • Registered since:

  • May 18, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Shanxi Fenglei Drilling Tools Co., Ltd. (Shanxi North Fenglei Industrial Group Co., Ltd.)

DESIGN APPROVAL

Equipment

  • Name:

  • 6-⅝″ OD Landing String Thick Walled Drill Pipe c/w 6-⅝″ Full Hole Connections (NS.03.30.00.1110)

  • Valid from:

  • March 31, 2019

  • Valid to:

  • March 30, 2021

  • Registered since:

  • March 31, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Smart Drilling GmbH

DESIGN APPROVAL

Equipment

  • Name:

  • Rotary Steerable Drilling System (NS.03.60.00.1110, NS.03.38.85.1110, NS.03.65.00.3110, NS.03.38.82.1110)

EXPIRED

  • Valid from:

  • September 01, 2016

  • Valid to:

  • August 31, 2018

  • Registered since:

  • September 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • Rotary Steerable Drilling System (NS.03.60.00.1110, NS.03.38.85.1110, NS.03.65.00.3110, NS.03.38.82.1110)

EXPIRED

  • Valid from:

  • September 01, 2016

  • Valid to:

  • August 31, 2018

  • Registered since:

  • September 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Bohai NKK Drill Pipe Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Arnco 350XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • November 24, 2017

  • Valid to:

  • November 23, 2019

  • Registered since:

  • November 24, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

CJWinter

PROCESS APPROVAL

Equipment process

  • Process:

  • Cold Root Rolling of Rotary Shouldered Connections

  • Equipment:

  • Rotary Shouldered Connections (NS.03.30.00.1110)

  • Valid from:

  • September 10, 2018

  • Valid to:

  • September 20, 2020

  • Registered since:

  • September 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Castolin Eutectic Ireland Limited

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • OTW 12Ti

  • Product(s) re-applied over:

  • OTW 12Ti

  • TCS™ Titanium

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )

Re-approval Assessment in Progress

  • Valid from:

  • August 16, 2017

  • Valid to:

  • August 15, 2019

  • Registered since:

  • August 16, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe with Welded Tool Joints.

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • OTW 13CF

  • Product(s) re-applied over:

  • OTW 13CF

  • TCS™ Titanium

  • Arnco 350XT™

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )

Re-approval Assessment in Progress

  • Valid from:

  • September 22, 2017

  • Valid to:

  • September 21, 2019

  • Registered since:

  • September 22, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe with Welded Tool Joints.

DP-Master Manufacturing Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • Duraband® NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • December 13, 2018

  • Valid to:

  • December 12, 2020

  • Registered since:

  • December 13, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • December 13, 2017

  • Valid to:

  • December 12, 2019

  • Registered since:

  • March 11, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • Arnco 150XT™

  • Arnco 350XT™

  • TCS™ Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • December 13, 2018

  • Valid to:

  • December 12, 2020

  • Registered since:

  • December 13, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

DURUM VERSCHLEISS-SCHUTZ GMBH

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • DURMAT FD 665

  • Product(s) re-applied over:

  • DURMAT FD 665

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • February 28, 2018

  • Valid to:

  • February 27, 2020

  • Registered since:

  • February 28, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Dongying Weima Petroleum Drilling Tools Co., Ltd.

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Product(s):

  • WT300 and WT300P

  • Valid from:

  • June 17, 2018

  • Valid to:

  • June 16, 2020

  • Registered since:

  • June 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Product(s):

  • Duraband® NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • February 28, 2019

  • Valid to:

  • February 27, 2020

  • Registered since:

  • February 28, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • North of Fuqiandajie, East of Quanzhoulu, EDZ, Dongying City, Shandong Province, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • February 28, 2019

  • Valid to:

  • February 27, 2020

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Grant Prideco (Jiangsu) Drilling Products Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Duraband® NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 08, 2019

  • Valid to:

  • January 07, 2021

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Arnco 150XT™

  • Arnco 350XT™

  • TCS™ Titanium

  • TCS 8000

  • Smooth X

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 08, 2019

  • Valid to:

  • January 07, 2021

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hebei Longway Petroleum Equipment Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Beikou Village, Yingli Town , Jinzhou, Shijiazhuang City, Hebei, People's Republic of China

  • Product(s):

  • TCS™ Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 29, 2019

  • Valid to:

  • January 28, 2020

  • Registered since:

  • January 29, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Henan Zhongyuan Special Steel Equipment Manufacturing Co., Ltd

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Jiyuan City Henan Province, 459008, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • June 20, 2018

  • Valid to:

  • June 19, 2020

  • Registered since:

  • August 12, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hilong Petroleum Pipe Company LLC

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Product(s):

  • BoTn 1000

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 12, 2017

  • Valid to:

  • January 11, 2018

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Product(s):

  • TC 2000

EXPIRED

  • Valid from:

  • January 12, 2017

  • Valid to:

  • January 11, 2018

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hunting Energy Services Limited

PROCESS APPROVAL

Wear Band application

  • Facility:

  • Unit 1, Hareness Circle, Altens Industrial Estate, AB12 3LY, United Kingdom

  • Product(s):

  • Wear Band

SUSPENDED

  • Valid from:

  • November 01, 2015

  • Valid to:

  • October 31, 2017

  • Registered since:

  • November 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Jiangsu Hexin Petroleum Machinery CO., LTD

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.9, Weiwu Road, Dongtai Industrial Park, Dongtai City, Jiangsu Province, 224200 , People's Republic of China

  • Product(s):

  • Arnco 150XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 31, 2018

  • Valid to:

  • January 30, 2019

  • Registered since:

  • January 31, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Product(s):

  • OTW 13CF

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )

  • Valid from:

  • June 17, 2019

  • Valid to:

  • June 16, 2020

  • Registered since:

  • February 28, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • March 31, 2019

  • Valid to:

  • March 30, 2021

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu TSC Coating Co., Ltd.

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • Shuguang Industrial Park, Shuguang Road, Baimi Town, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • TC 2000

  • Valid from:

  • June 26, 2019

  • Valid to:

  • June 25, 2020

  • Registered since:

  • June 26, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and development of product and services

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • Shuguang Industrial Park, Shuguang Road, Baimi Town, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • TC 2000P

  • Valid from:

  • June 26, 2019

  • Valid to:

  • June 25, 2020

  • Registered since:

  • June 26, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and development of product and services

Jiangyin Long-Bright Drill Pipe Manufacture Co. Ltd

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.820, Binjiang West Road, Ligang Town, Jiangyin City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 26, 2015

  • Valid to:

  • January 25, 2017

  • Registered since:

  • January 26, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Petromaterials (Cangzhou) Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Product(s):

  • TCS™ Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • May 14, 2018

  • Valid to:

  • May 13, 2020

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Internal Plastic Coating re-application procedure

  • Product re-applied:

  • Liquid Coating Product: PM 350, Powder Coating Product: PM 350P

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • April 22, 2019

  • Valid to:

  • April 21, 2020

  • Registered since:

  • April 22, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Product(s):

  • Arnco 350XT™

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • May 14, 2018

  • Valid to:

  • May 13, 2020

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Pipe & Drilling Tools Manufacture Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Petro & High-Tech Industrial Park Economic Development Zone, Panjin City, Liaoning 124013, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Arnco 350XT™

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

Re-approval Assessment in Progress

  • Valid from:

  • August 22, 2017

  • Valid to:

  • August 21, 2019

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Postle Industries, Inc.

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Duraband® NC

  • Product(s) re-applied over:

  • Smooth X

  • Duraband® NC

  • Armacor

  • TCS™ Titanium

  • TCS 8000

  • Tuffband NC

  • Arnco 150XT™

  • Arnco 100XT™

  • OTW 12Ti

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Valid from:

  • March 17, 2019

  • Valid to:

  • March 16, 2021

  • Registered since:

  • December 11, 2009

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Tuffband NC

  • Product(s) re-applied over:

  • Smooth X

  • Tuffband NC

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • March 16, 2019

  • Valid to:

  • March 15, 2021

  • Registered since:

  • March 16, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe.

Schlumberger Drilling Tools & Remedial

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 1310 Rankin Road, Houston, Texas 77073, United States

  • Product(s):

  • Duraband® NC

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Valid from:

  • November 25, 2017

  • Valid to:

  • November 24, 2019

  • Registered since:

  • November 25, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Shanghai Hilong Drill Pipe Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Product(s):

  • BoTn 1000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 15, 2019

  • Valid to:

  • January 14, 2021

  • Registered since:

  • January 15, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Product(s):

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • June 26, 2019

  • Valid to:

  • June 25, 2020

  • Registered since:

  • June 26, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 15, 2018

  • Valid to:

  • January 14, 2019

  • Registered since:

  • January 15, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Shanghai Tianhe Oil Engineering Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Arnco 150XT™

  • Arnco 300XT™

  • Arnco 350XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment